Lightning Power.
All services

Service

Panel Upgrades & Service Changes

Modern panels, properly sized, properly grounded.

Overview

Whether you're future-proofing for an EV charger, solar, or just retiring a 60-amp Federal Pacific, we right-size the service and pull the permits the inspector wants to see.

What’s included

  • 100A / 200A / 400A service upgrades
  • Square D, Eaton, Siemens (no FPE, no Zinsco)
  • Coordinated meter swaps with the utility
  • Sub-panels for additions, shops, ADUs
  • Whole-home surge protection at the panel

What you walk away with

  • Permitted and inspected, paperwork in your hand
  • Bonded grounding electrode system, verified
  • Photo-documented before/after

Common questions

  • Typical residential panel swap: 4 to 6 hours of no power, scheduled around your day. Service-change projects with utility coordination take longer; we'll give you a window in writing.

One text. One conversation. One bill.

Got something electrical that’s bugging you?

Skip the form, skip the call center. Text German directly. He reads every message and most of the time he’s the one who shows up.

Or use the contact form